Saturday 10 October 2020

Week 3 - the Build

This week its been more work on the wiring loom. Stripping out the bits I dont need and revealing the bits I need to extend and move. The fuel tank moves from the back of the Fiesta to the front of Amfey while the radiator fan moves from the front to the back. I'll extend these when the time comes.

The highlight of the week was installing the pedals together with the brake cylinder and ABS control unit. It will be the first boat I've had with traction control and ABS!

I also bolted in the interior fuse box and control unit. Nearly ready for the dashboard! 

Here is the inside of the bonnet/focastle with the brake master cylinder and servo on the left and the ABS control unit on the right

 

And in the cockpit the pedals and secured wiring all looking fine and dandy!



Next week its suspension strut refurbishment.


No comments:

Post a Comment

Week 57 - The Test

 Got all the paperwork off to register it as a car now to test it as a boat!! Here are a couple of videos and some photos of it in action....